Land plot № 25 in Kerch

Land area 2,83 ha
Location Kerch c.
Type of ownership Municipal
Transfer form Rent

The land plot is recommended to be used under placement of the industrial enterprise (metallurgy, mechanical engineering, production of construction materials) of not higher than 3 hazard class

Infrastructure:
  • Gas supply - 120 m3 / h, medium pressure
  • Sewerage - 10 m3 / day
  • Water supply - 15 m3 / day
  • Power supply - 400 kW
Transport accessibility:
  • To the highway R-260 " Tavrida" – 13 km, an entrance – soil
  • Junction railway station - 11 km
  • Kerch Sea Port - 8 km
  • Simferopol Airport (SIP) - 230 km

Photo Gallery